Header
Contact & Enquiries: +44 161 882 9922
Footer
Starchaser Industries LTD - Unit 7 - Hyde Point - Dunkirk Lane - Hyde - Cheshire - SK14 4NL
Copyright          - Starchaser - all rights reserved - design by Starchaser Industries LTD
2014
623

Storm rocket engine progress
Before every test firing we perform a series of high pressure water flow tests which are designed to calibrate and test the system. These tests put the engine under far more stress than even a hot firing, but are necessary in order to ensure that everything is performing correctly.

Unfortunately during one of the concluding tests of the Storm system, a weld failed inside the combustion chamber and, given its position, this means that the chamber has to be rebuilt from scratch.

We still intend to conduct the tests as previously planned, but we are looking at them being delayed to later this year, depending on our analysis, rebuild, and further testing of a replacement chamber.

Some older browsers don't support iframes.

If they don't, the iframe will not be visible.